The scope includes engineering, procurement, construction, installation and commissioning (EPCIC) for topside modification. The purpose is to prepare the Troll A platform for receiving and processing gas from eight new wells at Troll West. SourceContinue Reading
The FEED contract scope of work includes the modular design of a greenfield LNG production facility in Afungi, all associated gas pre-treatment units and the utilities and offsite systems to support the LNG production. The plant will have an overall production capacity of 18 million tons per annum. The scope of work also includes the...Continue Reading
From operator reports, BSEE estimates that approximately 3.35% of the current oil production and 0.91% of the current natural gas production in the Gulf of Mexico is shut-in. SourceContinue Reading
To finalize the deal, however, Chevron and Hess still need to prevail in arbitration against Exxon Mobil Corp. and Cnooc Ltd., who claim a right-of-first-refusal on Hess’ biggest asset — a 30% stake in a massive oil field offshore Guyana. The case, currently being administered by the International Chamber of Commerce, is likely to be...Continue Reading
The main production facilities include a new fixed production platform and three centralized subsea wellheads, with 12 development wells planned to be commissioned. It is expected to reach peak production of 162 MMcfgd and 3,931 bpd in 2025. SourceContinue Reading
The supermajor is working on developing the deepwater Owo project, Nigerian Vice President Kashim Shettima said after meeting Exxon Nigeria chairman Shane Harris. The company also proposed to spend $2.5 billion annually to boost oil output by 50,000 bpd over the next few years, Shettima said. SourceContinue Reading
TotalEnergies has signed an agreement with Lewis Energy Group to acquire a 45% interest in dry gas producing assets owned and operated by Lewis Energy Group in the Eagle Ford basin in Texas. SourceContinue Reading
The Onshore Block 2, located within the Al Dhafra region of Abu Dhabi covering an area of over 7300 km2, is PETRONAS Abu Dhabi’s third concession, following the Unconventional Block 5 in 2024 and the Unconventional Block 1 in 2022. SourceContinue Reading
The supermajor is working on developing the deepwater Owo project, Nigerian Vice President Kashim Shettima said after meeting Exxon Nigeria chairman Shane Harris. The company also proposed to spend $2.5 billion annually to boost oil output by 50,000 bpd over the next few years, Shettima said. SourceContinue Reading
Upon closing, the combined company will be the largest natural gas producer in the U.S. and assume the name Expand Energy Corporation. SourceContinue Reading