The latest analysis from Westwood Global Energy Group reveals that despite favourable oil prices in 2022, high impact exploration drilling in 2023 declined by 21%, due to energy transition strategies, industry consolidation, rising well costs and reduced activity in former hotspots. SourceContinue Reading
OPEC and its allies agreed on Sunday to gradually wind down about 2 MMbpd of production cuts starting in October. Since then, crude prices have fallen more than 3% in London, dipping below $80 a barrel as analysts question whether the market can absorb this extra supply. SourceContinue Reading
SBM Offshore announced that a Fast4Ward hull for the Block 58 development project offshore Suriname has been reserved by TotalEnergies. The announcement is in line with the Front End Engineering and Design (FEED) studies for a Floating Production, Storage and Offloading vessel (FPSO) for the development project. SourceContinue Reading
Emerson’s suite of Roxar downhole monitoring tools will empower Equinor to use advanced oil recovery techniques, optimize reservoir performance and verify well integrity in real time. The Rosebank field is estimated to contain over 300 MMbbl of recoverable oil resources. SourceContinue Reading
The Kaskida project is a greenfield development 250 miles southwest of New Orleans, in the Keathley Canyon area of the Gulf of Mexico. Comprising a single topside module supported by a four-column semi-submersible hull, the Kaskida FPU is supported by subsea production wells located in a water depth of approximately 6,000 ft. SourceContinue Reading
The second day of the Energy NL Annual Conference & Exhibition 2024 got underway today with a morning address by the Honourable Seamus O’Regan Jr., Minister of Labour and Seniors, who outlined the Government of Canada’s efforts to support energy development, including amendments to the Atlantic Accord. SourceContinue Reading
The comprehensive campaign spans over 120 days and is segmented into five sub-campaigns, each addressing specific tasks crucial for the decommissioning process. SourceContinue Reading
The block has significant 2D and 3D seismic data already completed and no additional seismic acquisition or drilling of wells is planned in the three-year carried period. During this period, Eco will complete the interpretation and analysis required for its planned Work Program with its in-house exploration team. SourceContinue Reading
Enverus Intelligence Research (EIR), a subsidiary of Enverus, has released new research that analyzes which oil and gas plays show the greatest rate of increase in drilling speeds and whether well costs correlate with drilling speeds. In addition, the report looks at how well designs are affecting drilling efficiencies. SourceContinue Reading
Engineering studies (FEED) are progressing for the development of the Sapakara and Krabdagu fields, with combined recoverable resources estimated above 700 MMbbl, thanks to the integration of Water Alternating Gas (WAG) injection technology to maximize recovery. SourceContinue Reading